Excavation checklist
1. Are all the safety norms being covered as per HSEM process.
2. Excavation plan prepared and approved by client/ consultant.
3.check for completion of other activity such as a contour survey.
4.layout alignment and size of excavation marked on ground as per excavation plan.
5.there any under ground utilities like sewer line water line cable . inform about site incharge and take action.
6.the markings done and approved by surveyor as per drawing.
7. Check for dewatering arrangements.
8.if blasting check if the explosive carried in specify boxes with safety.
9. Check all instrument is OK .
10.check the all machinery work don according to safety.
Formwork checklist
1. Are all the safety norms being covered as per HSEM process.
2.all the plate/plywood cleaned and polished properly.
3. Oil or polish use of the surface on Shattering.
4.vertical member shear wall columns lift wall check the starter .
5.check alignment of all verticals members
at floor level with respect grid line.
6.check plumb of vertical members 2 sides.
7. Check the support all side of shuttering.
8. Check the concrete cover block.
Slab and beams
1.check the alignment of beams size sides according to drawings.
2. Check the line and label of slab.
3.check the size of slab grid to grid according to drawings.
4.check the form work is water proof.
5.check the vertical support for vertical members.
6.check the selling of gape hole in slab is proper block.
7.proper cleaning for next use.
8.check horizontal support are OK.
9 .check out the cleaning of all Shuttering.
10 .check the all size beams columns slab according to drawing.
Check list for reinforcement
1. Bar bending schedule approved.
2.check the cutting bending the bar as per BBS.
3.Bar dia . Shape of bar . dimension of bar.
Number of bar.
4.check cleanliness of bar
5. Check spacing of steel as per drawing.
6. Check steel fixing as per steel drawing.
7.check for satisfactory tying with bending wire.
8.check lap length and location of length.
9. Check concrete cover
10.check the master ring above columns at the slab level.
11.check the steel aliment on placing time.
12 .proper chair bar for bottom and top steel mesh.
Check list during concrete
1. Check the slump.
2.check temperature of concrete in case of temperature controlled concrete.
3. Check placing method of concrete .
4.proper vibrator being done.
5. Check the provision of construction joint as per drawing.
6.check the surface of slab level is done by surveyor and drawing .
7.check the top finishing of slab.
8.check the top level of slab